Kevin's Corner

The Kevin's Corner Mine development is a well delineated thermal coal deposit in a premium location of the Galilee Basin, Queensland, Australia. Kevin’s Corner is located immediately to the north and adjacent to the preceding Alpha Coal Project. 

The Kevin’s Corner thermal coal deposit is owned by Hancock Galilee Pty Ltd (HGPL), which is a wholly owned subsidiary of the GVK Group. It was previously owned by Hancock Prospecting Pty Ltd. until 2011. 

The Kevin's Corner mine development is based upon a JORC (Joint Ore Reserves Committee, 2004) compliant resource of 4.2Bt, including 473Mt in reserve category, modelled from drilling of approximately 800 drill holes since the 1970’s.

The deposit exhibits excellent characteristics for high productivity underground longwall mining, supported by open-cut operations. Studies have indicated a high potential for long and wide high-reach longwall panels with simple mine development roadway access, enabling high volume, high productivity, low cost underground longwall mining. 

Kevin's Corner mine plan is designed around a stand-alone mining project that will stage the ramp up to full production over a period of five to seven years after a two year construction period to first coal. 

The Kevin's Corner Project is anticipated to employ thousands of people throughout its productive life. The workforce is anticipated to peak at approximately 2,500 people during construction, with a workforce of 1,600 to 1,800 during operations phase depending on the final mine configuration.

Publications

 

Kevin's Corner Project Supplementary Environmental Reports 2013

Biodiversity Offsets Plan (Public Document) May 2013

Environmental Management Plan May 2013

Off-lease Environmental Management Plan May 2013

Rehabilitation Management Plan May 2013

Social Impact Management Plan May 2013

Updated Proponent Commitment Register May 2013

Kevin's Corner SEIS 2012

Volume 1

Volume 1 - Section 01 Introduction

Volume 1 - Section 02 General Comments and Responses

Volume 1 - Section 03 DEHP Comments and Responses

Volume 2

Volume 2 - App A Glossary Abbreviations and Units

Volume 2 - App B References

Volume 2 - App C List of Proponent Committments - Superseded

Volume 2 - App D Social Impact Management Plan - Superseded

Volume 2 - App E Geochemical Assessment Coal Mining Waste

Volume 2 - App F Aquatic Ecology Assessment

Volume 2 - App G Revised Air Quality and GHG Asmnt - Supp Report

Volume 2 - App H Revised Noise and Vibration Assessment

Volume 2 - App I Off Lease Assessment

Volume 2 - App J Revised Road Impact Assessment

Volume 2 - App K Revised Surface Water Hydraulics Report

Volume 2 - App L Groundwater Report

Volume 2 - App M Site Water Management (BoD) Report

Volume 2 - App N Interim Subsidence Management Plan

Volume 2 - App O Cumulative Impacts Assessment

Volume 2 - App P Biodiversity Offset Strategy - Superseded

Volume 2 - App Q MNES

Volume 2 - App R Consultation Report

Volume 2 - App S Cumulative Surface Water Impact Assessment

Volume 2 - App T1 Environmental Management Plan - Superseded

Volume 2 - App T2 Off Lease Environmental Management Plan

Volume 2 - App T3 Cudmore Resources Reserve Operations Plan1

Volume 2 - App T4.01 Interim Waste Management Plan

Volume 2 - App T4.02 Pest and Weed Management Plan

Volume 2 - App T4.03 - Air Quality Coal Dust MP (ToC)

Volume 2 - App T4.04 - Erosion and Sediment Control Plan (ToC)

Volume 2 - App T4.05 - Groundwater MP (ToC)

Volume 2 - App T4.06 - Landfill Design EMP (TOC)

Volume 2 - App T4.07 - Overburden and CHPP Rejects Management Plan (ToC)

Volume 2 - App T4.08 - Noise and Vibration MP (ToC)

Volume 2 - App T4.09 Rehabilitation Management Plan - Superseded

Volume 2 - App T4.10 - Sewage Treatment MP (ToC)

Volume 2 - App T4.11 - Surface Water MP (ToC)

Volume 2 - App T4.12 - Mine Water MP (ToC)

Volume 2 - App T4.13 - Topsoil MP (ToC)

Kevin's Corner EIS 2011

Volume 1 - Sections

Volume 1 Section 00 Executive Summary

Volume 1 Section 01 Introduction

Volume 1 Section 02 Project Description

Volume 1 Section 03 Climate

Volume 1 Section 04 Geology

Volume 1 Section 05 Soils

Volume 1 Section 06 Land Use PlanningTenure

Volume 1 Section 07 Landscape Character

Volume 1 Section 08 Land Contamination

Volume 1 Section 09 Terrestrial Ecology

Volume 1 Section 10 Aquatic Ecology and Stygofauna

Volume 1 Section 11 Surface Water

Volume 1 Section 12 Groundwater

Volume 1 Section 13 Air Quality

Volume 1 Section 14 GHG and Climate Change

Volume 1 Section 15 Noise and Vibration

Volume 1 Section 16 Waste

Volume 1 Section 17 Transport

Volume 1 Section 18 ICH

Volume 1 Section 19 NICH

Volume 1 Section 20 Social

Volume 1 Section 21 Community Consultation

Volume 1 Section 22 Health and Safety

Volume 1 Section 23 Economics

Volume 1 Section 24 Hazard and Risk

Volume 1 Section 25 Sustainability

Volume 1 Section 26 Decom and Rehab

Volume 1 Section 27 Cumulative Impacts

Volume 1 Section 28 EMP

Volume 1 Section 29 SIMP

Volume 1 Section 30 MNES

Volume 1 Section 31 References

Volume 2 - Appendices

Volume 2 Appendix A ToR

Volume 2 Appendix B TOR Cross-Reference Table

Volume 2 Appendix C Glossary Abbrev Units

Volume 2 Appendix D Study Team

Volume 2 Appendix E Project Approvals

Volume 2 Appendix F Corporate Environmental Policy

Volume 2 Appendix G Commitments

Volume 2 Appendix H MNES

Volume 2 Appendix I Soils Topography and Land Disturbance

Volume 2 Appendix J Subsidence

Volume 2 Appendix K Land Contamination

Volume 2 Appendix L1 Flora and Fauna Assessment

Volume 2 Appendix L2 Aquatic Ecology Assessment

Volume 2 Appendix L3 Stygofauna Assessment

Volume 2 Appendix M1 Fluvial Geomorphology Report

Volume 2 Appendix M2 2.1 and 2.2 combined

Volume 2 Appendix M3 Site WMS and Water Balance Technical Report

Volume 2 Appendix M4 Surface Water Quality Technical Report

Volume 2 Appendix N1 Groundwater Technical Report

Volume 2 Appendix N2 Groundwater Bore Survey Report

Volume 2 Appendix O Air Quality Draft

Volume 2 Appendix P Noise and Vibration

Volume 2 Appendix Q1 Geochemical Characterisation

Volume 2 Appendix Q2 TSF

Volume 2 Appendix R Transport

Volume 2 Appendix S NICH

Volume 2 Appendix T SIA

Volume 2 Appendix U Hazard and Risk

Volume 2 Appendix V Economics

Volume 2 Appendix W EMP

Volume 2 Appendix X Cumulative Impacts

Volume 2 Appendix Y Community Consultation

Volume 2 Appendix Z Offsets Strategy Report

Kevin's Corner Final Terms of Reference February 2010

Kevin's Corner Final Terms of Reference February 2010

Kevin's Corner Initial Advise Statement September 2009

Kevin's Corner Initial Advise Statement September 2009